RCD Electrical carries out electrical rewiring for homes, rental properties and commercial premises across London, with the work planned around the condition, layout and electrical needs of the property.

Full or Partial Rewiring Wiring and Circuit Upgrades London Appointments
Electrical rewiring services in London

Rewiring Planned Around Your Property and Its Use

Electrical rewiring replaces unsuitable, damaged or outdated fixed wiring and allows the installation to be planned around the way the property is used. The required work can range from one affected circuit to a full rewire, so the property must be inspected before the scope and quotation can be confirmed.

Initial discussion and property assessment Full or partial rewiring considered Scope agreed before work begins
01 · Rewiring overview

What Electrical Rewiring Involves

Rewiring is planned around the condition of the existing installation, the layout of the property and the electrical demand expected from each area.

01

Replacing Existing Wiring

Wiring and circuits that are unsuitable or in poor condition can be replaced as part of a defined rewiring plan.

02

Planning the Required Points

Socket outlets, switches, lighting points and fixed supplies are considered against the way each room will be used.

03

Testing the Completed Work

New circuits are inspected and tested after installation, with the relevant documentation prepared for the completed electrical work.

A full rewire is not always the right starting point. An isolated problem may need electrical fault finding and repair instead. Sparking, a burning smell, exposed live parts or sudden loss of power should be treated as urgent and checked through our emergency electrician service.
02 · Reasons for rewiring

When a Rewiring Assessment Makes Sense

The age of a property alone does not confirm that it needs rewiring. The decision should be based on the condition, safety and suitability of the fixed installation.

01

Damaged or Deteriorated Wiring

Visible damage, heat marks or deterioration may indicate that part of the installation needs closer inspection.

02

Repeated Electrical Problems

Frequent tripping, intermittent faults or circuits that no longer perform as expected need proper investigation.

03

Unsuitable Earlier Alterations

Previous additions may not suit the present layout, loading or protection of the installation.

04

Renovation or Layout Changes

Major refurbishment can provide an opportunity to reposition points and replace wiring before finishes are completed.

05

Insufficient Circuits or Outlets

A property may need a better circuit arrangement where existing points no longer support normal use.

06

Findings from an Electrical Report

An inspection may identify wider deterioration or several affected circuits that need a separate rewiring review.

03 · Before we quote

What We Review Before Confirming the Scope

Rewiring quotations depend on the actual property. A review helps establish what can remain, what needs replacing and how the work can be carried out with realistic access.

Existing circuits

Condition and Arrangement

We consider the existing circuit layout, visible wiring condition and any known test results or previous reports.

Property use

Current Electrical Demand

The number and location of outlets, lighting points and fixed supplies should match how the rooms are actually used.

Access

Floors, Walls and Ceilings

Access routes affect how cables can be installed and which areas may need opening before the work can proceed.

Future plans

Upcoming Electrical Loads

Planned equipment and property changes should be discussed before the final circuit arrangement is agreed.

Why an assessment is required

Two similar-sized properties can need very different work. The number of circuits, access, occupancy, finish level and intended use all affect the rewiring plan.

The assessment can also identify related work that should be planned at the same stage, such as a consumer unit replacement, an EV charger supply or dedicated wiring for a fixed air-conditioning system.
04 · Rewiring process

How the Work Is Planned and Carried Out

The sequence depends on the property, access and agreed scope. The main stages below show how a rewiring project is usually organised.

  1. 01

    Discuss the Property

    We review the reason for the enquiry, known problems, planned use and any renovation work.

  2. 02

    Inspect and Plan

    We assess the installation, discuss access and define the circuits and electrical points required.

  3. 03

    Agree the Scope

    The proposed work, exclusions and practical arrangements are confirmed before the project starts.

  4. 04

    Install and Test

    The agreed wiring is installed, inspected and tested, with final checks completed before handover.

Before work starts

Prepare Access and Coordinate Other Trades

Clear planning reduces avoidable disruption and helps the electrical work fit around building, decorating or renovation schedules.

  • Confirm which rooms and circuits are included
  • Discuss occupied and vacant areas
  • Identify furniture, flooring and access restrictions
  • Coordinate plastering, joinery and decoration
Tell us about planned specialist systems before the circuit layout is finalised. This may include data wiring and cabling, EV charging, fixed cooling equipment, emergency lighting or fire alarm supplies.
Items That Must Be Agreed Separately
  • Making good, plastering and decoration
  • Removal or relocation of furniture and fitted units
  • Specialist data, alarm or control systems
  • Work outside the agreed rewiring scope
05 · Defining the project

What Can Change the Rewiring Scope

The final plan is shaped by more than the number of rooms. Access, retained wiring, new electrical loads and the required finish all need to be considered.

01

Existing Installation

The condition and arrangement of existing circuits determine what may remain and what needs replacement.

02

Access and Construction

Solid floors, finished walls, fitted furniture and restricted routes can change how the wiring is installed.

03

New and Future Loads

Additional equipment may require dedicated circuits or changes to the planned distribution of power.

04

Finishes and Making Good

The agreed responsibilities for access openings, repairs and decoration should be clear before work begins.

Partial rewire Used where the required work is limited to defined circuits or areas.
Full rewire Considered where the replacement needs to cover the wider fixed installation.
Related upgrades Additional supplies and protective equipment are reviewed as part of the project plan.
One coordinated project

Plan Wider Electrical Work Before Walls Are Closed

Where the property is being refurbished, wider electrical installations can be coordinated with the rewiring plan before finishes are completed.

View Contractor Services
06 · Planning and quotation

Why Rewiring Needs a Property Review First

We do not publish a fixed rewiring price because the required work cannot be confirmed from the property type or bedroom count alone.

The quotation follows the assessment The agreed scope should reflect the installation, access, required points and planned use.
Property details

Tell Us What Is Changing

Share the property type, affected areas, known electrical issues and any renovation plans.

Photos, plans or an existing EICR can help with the initial discussion.
Site assessment

Review the Existing Installation

Access, circuit arrangement, consumer unit condition and the proposed electrical points are considered on site.

The review helps distinguish targeted work from a wider rewire.
Defined scope

Confirm What Is Included

The quotation should state the agreed electrical work and identify any exclusions or separately arranged items.

Making good and decorative work should be discussed before the start date.
Project timing

Plan Access and Occupancy

The sequence depends on room access, other trades and whether the property remains occupied during the work.

Practical arrangements are confirmed alongside the final scope.

A quotation can only be prepared after enough information has been gathered to understand the work. Additional defects or inaccessible wiring discovered later may need separate review before any change to the agreed scope.

07 · Why rewiring may be needed

Why Electrical Rewiring May Be Needed

Electrical rewiring replaces unsuitable or deteriorated wiring and allows circuits, sockets, lighting points and fixed equipment supplies to be planned around the way the property is used. The correct scope can only be confirmed after the existing installation, access and planned changes have been reviewed.

A rewiring assessment is not an emergency call-out. Sparking, a burning smell, hot accessories, repeated tripping or an unexpected loss of power should be checked promptly by an emergency electrician in London.

Condition and safety Older Wiring Does Not Always Mean a Full Rewire

The age of a property alone does not determine the work. The wiring, accessories, joints, earthing arrangements and protective devices need to be assessed before deciding whether individual repairs, circuit replacement or wider rewiring is appropriate.

Deteriorated cables or accessories

Heat, moisture, physical damage and previous alterations can affect cables, sockets, switches and connections.

Unsafe or unsuitable alterations

Earlier DIY work or poorly planned additions may leave circuits with unsuitable connections, loading or protection.

Local fault or wider problem

A problem affecting one circuit may need targeted investigation rather than rewiring the whole property.

Capacity and future use The New Installation Should Match How the Property Will Be Used

Rewiring gives the electrical layout an opportunity to reflect current and planned use. Socket positions, lighting controls, kitchen equipment, heating, home offices and fixed electrical systems should be discussed before cable routes and circuit arrangements are agreed.

Rooms and fixed equipment

The number and position of electrical points should suit the room layout and the equipment that will be connected.

Separate circuit requirements

Higher-load equipment and specialist systems may need dedicated circuits rather than being added to an existing arrangement.

Planned changes

Extensions, loft conversions, kitchen work and future equipment can affect the design and timing of the rewire.

Access and sequencing Rewiring Needs to Be Planned Around the Building Work

Cable routes may pass through walls, floors, ceilings and service areas. Access, finishes, furniture, occupancy and other trades all affect how the work can be carried out and what preparation may be needed before the installation starts.

Occupied or empty property

An occupied home requires different access and sequencing from an empty property undergoing renovation.

Decorative finishes

Existing wall, ceiling and floor finishes can affect cable routes and the level of opening or making good required.

Coordination with other trades

Electrical first-fix and second-fix work should be arranged around plastering, joinery, kitchens and other building work.

Assessment before quotation The Scope and Cost Depend on a Property Review

Rewiring cannot be priced accurately from the number of bedrooms alone. The quotation depends on the condition and layout of the installation, circuit requirements, access, finishes, occupancy and the electrical points or fixed systems included in the work.

Review the existing installation

We need to understand the consumer unit, circuit arrangement, accessible wiring and any known electrical concerns.

Discuss the required layout

Socket outlets, lighting points, controls, equipment supplies and future plans should be agreed before the scope is prepared.

Confirm access and exclusions

The quotation should state the agreed electrical work, access assumptions and any making good or related work not included.

RCD Electrical · London Rewiring Services

Arrange an Electrical Rewiring Assessment

Send us the property details, planned changes and any existing reports. We will review the requirements and arrange a consultation or site visit before confirming the scope and preparing a quotation.

The final rewiring scope is confirmed only after the property, existing installation, access requirements and proposed electrical layout have been reviewed. You can also send the details through our contact page.
Before We Plan the Work

Details We Need Before Planning Your Electrical Rewire

Electrical rewiring needs to be assessed around the existing installation, the planned layout and how the property will be used. A site visit and review are needed before we confirm the work or provide a quotation.

Property and Existing Wiring

Tell us whether the property is a flat, house, HMO or commercial premises, along with any known issues or previous electrical work. Where the condition is unclear, an EICR inspection may help establish what needs attention.

Planned Electrical Layout

Explain any proposed changes to sockets, lighting, appliances or room layouts. This allows the new circuits and electrical points to be planned around the finished property, including any future EV charger requirements.

Access, Occupancy and Finishes

Let us know whether the property is occupied, empty or being renovated, and where walls, floors or ceilings can be opened. If the concern is limited to one area, electrical fault finding may be more suitable than a wider rewire.

RCD Electrical electrician reviewing an existing electrical installation before rewiring work in London
RCD Electrical Rewiring Guidance

Electrical Rewiring Questions Answered Clearly

Practical answers about full and partial rewiring, property surveys, access, disruption, electrical layouts and quotations in London.

Assessment before scope and quotation

Rewiring should be planned around the existing installation, the property layout and the electrical points required. A site review is needed before the work, programme and quotation can be confirmed.

01 What does electrical rewiring involve?

Electrical rewiring replaces unsuitable or deteriorated cables and updates the circuits serving the property. The exact work depends on the existing installation, the planned room layout and which electrical points need to remain, move or be added.

02 Does an older property always need a full rewire?

No. The age of a property alone does not confirm that every circuit must be replaced. Some installations need a full rewire, while others may only need work to particular circuits or areas. The wiring should be assessed before the scope is agreed.

03 How can I tell if my property may need rewiring?

Repeated faults, damaged accessories, signs of overheating, unreliable circuits or concerns raised in an electrical report may justify further assessment. If there is an active fault, arrange electrical fault finding rather than assuming that a complete rewire is required.

04 What is the difference between a full and partial rewire?

A full rewire covers the electrical installation across the property. A partial rewire is limited to agreed circuits, rooms or sections. The right approach depends on the condition of the existing wiring and whether unaffected parts can remain safely in service.

05 Why is a site survey needed before rewiring is quoted?

A site survey allows us to review the existing wiring, consumer unit, circuit layout, access routes and proposed electrical points. We also need to understand whether the property is occupied or being renovated. This information is needed before the work and quotation can be prepared properly.

06 How much does electrical rewiring cost?

Electrical rewiring does not have one fixed price. The cost depends on the property, number of circuits, required sockets and lighting points, access, finishes and the extent of the work. A quotation can be prepared after the installation and proposed layout have been reviewed.

07 How long does an electrical rewire take?

The programme depends on the size and layout of the property, the agreed scope, access and whether other building work is taking place. A partial rewire may require less time than work across the whole property. The expected schedule should be confirmed after the survey.

08 Can rewiring be completed while the property is occupied?

This depends on the scale and layout of the work. Rewiring normally involves circuit isolation, access to several rooms and disruption to normal use. An empty property is often easier to plan, but occupied work can be discussed during the assessment.

09 Will walls, ceilings or floors need to be opened?

Cable routes may require access behind finishes, below floors or through ceilings. The amount of opening depends on the construction of the property and the routes available. Access requirements, making good and decorative work should be clarified before the job starts.

10 Does a rewire always require a new consumer unit?

Not automatically. The existing consumer unit and protective devices need to be reviewed as part of the installation. If they are unsuitable for the proposed circuits or require replacement, a fuse box or consumer unit upgrade can be included in the planned work.

11 Can sockets, lighting and appliance supplies be changed during a rewire?

Yes, the proposed layout should be discussed before work begins. This is the stage to confirm socket positions, lighting controls and supplies for fixed appliances. Planned EV charging or data cabling requirements should also be raised early so the electrical routes can be considered together.

12 Do I need an EICR before arranging a rewire?

Not in every case. Where the condition of the existing installation is uncertain, an EICR can provide useful information about the fixed wiring and affected circuits. A rewiring survey is still needed to plan the new layout and confirm the actual scope.

13 Is rewiring the right response to sudden tripping or a burning smell?

Not necessarily. Sudden power loss, repeated tripping, sparking, heat or a burning smell should be investigated promptly. An emergency electrician or targeted fault finding may identify a local problem without committing the property to wider rewiring.

14 What information should I provide before requesting an assessment?

Provide the postcode, property type, approximate layout, occupancy status and details of any renovation work. Mention known electrical problems, previous reports and proposed changes to sockets, lighting, appliances or rooms. This helps us prepare for the site visit.

The required work depends on the condition of the existing installation, the agreed layout and access within the property. The final scope should be based on the site assessment rather than the age of the building alone.

Electrical rewiring assessments in London

Arrange a Review Before Planning the Rewire

Send us the property details and proposed electrical changes. We will review the requirements before confirming the scope and quotation.

London coverage

Electrical Rewiring Assessments Across London

We arrange rewiring assessments across Central, West and North West London, including the areas listed below.

  • Fulham
  • Hammersmith
  • Chelsea
  • Kensington
  • Holland Park
  • Putney
  • Battersea
  • Westminster
  • Central London
  • West London
  • North West London
  • Blackfriars
  • Golders Green
  • Finchley
  • Hendon
  • Hampstead
  • West Hampstead

Property outside these locations? Send us the postcode through the contact page and we will confirm availability.

Electrical rewiring in London

Request a Rewiring Assessment

Provide the property details through our contact page or use the booking form to request an initial assessment. We will review the information and confirm the next step before any quotation is prepared.