Cable routes may pass through walls, floors, ceilings and service areas. Access,
finishes, furniture, occupancy and other trades all affect how the work can be carried
out and what preparation may be needed before the installation starts.
Occupied or empty property
An occupied home requires different access and sequencing from an empty property undergoing renovation.
Decorative finishes
Existing wall, ceiling and floor finishes can affect cable routes and the level of opening or making good required.
Coordination with other trades
Electrical first-fix and second-fix work should be arranged around plastering, joinery, kitchens and other building work.
For rewiring linked to refurbishment, extensions or work across several parts of a property,
our
electrical contractor service
can help coordinate the electrical stages with the wider programme.