Home and Workplace EV Charging

EV Charger Installation in London

RCD Electrical installs electric vehicle charging points for homes, rental properties and workplaces across London. The installation is planned around the charger, parking position, cable route, electrical supply and the agreed work.

Home EV Charger Installation Workplace Charging Points Installation Assessment
EV charger installation in London

Electric Vehicle Charging for Homes and Workplaces

RCD Electrical installs electric vehicle charging points for homes, rental properties and workplaces. The work is planned around the vehicle, charger, parking position, cable route and existing electrical supply.

Home EV charger installation Workplace and managed-site charging Supply, protection and cable-route assessment
01 · EV charging overview

What EV Charger Installation Can Include

The service covers the agreed electrical work needed to install an EV charging point, including assessment, a dedicated supply where required, circuit protection, installation, testing and handover.

01

Home EV Charging

A home charger can be planned around the parking space, vehicle, daily charging needs and the property’s electrical supply.

02

Workplace and Managed Sites

Single or multiple charging points can be assessed for workplaces, rental properties and managed parking areas.

03

Replacement and Upgrades

An existing charger, cable route or electrical supply can be assessed where replacement, relocation or upgrading is requested.

This page covers planned EV charger installation. A charger that is overheating, damaged, sparking or repeatedly tripping should not remain in use. Report the fault to an emergency electrician in London.
02 · Installation scope

What an EV Charger Installation May Include

The final scope depends on the selected charger, vehicle, parking position, cable route, electrical capacity and the condition of the existing installation.

01

Charger Type and Position

The charger and mounting position are reviewed against the vehicle inlet, parking arrangement and practical access.

02

Cable Route

The route from the electrical supply to the charger is planned around access, distance and the property finish.

03

Dedicated Electrical Supply

A suitable circuit and isolation arrangement are included where required by the charger and electrical installation.

04

Protection and Earthing

Protective devices and earthing arrangements are assessed for the charger, property supply and installation method.

05

Load and Supply Assessment

Existing demand, supply capacity and any load-management requirements are reviewed before the installation is confirmed.

06

Testing and Handover

The completed circuit and charger are tested, and the agreed operating and installation information is explained.

03 · Electrical assessment

Checks Before an EV Charger Is Installed

The assessment considers the charger, vehicle, parking arrangement, cable route, consumer unit, earthing and existing electrical demand.

Supply

Available Electrical Capacity

The existing supply and expected demand are reviewed before the proposed charging rate is confirmed.

Board

Consumer Unit and Protection

The consumer unit, available ways and protective arrangements are assessed for the proposed charger circuit.

Route

Parking and Cable Route

The parking position, charger location and cable route are checked for practical access and installation constraints.

Network

DNO Requirements

The installer must notify the Distribution Network Operator or apply before installation where the connection process requires it.

Assessment note

The available charger output cannot be confirmed from the charger rating alone. Vehicle limits, electrical capacity, existing demand and network requirements can all affect the final installation.

A charger installation may also lead to separate work on the consumer unit or the wider electrical installation.
04 · Installation process

What Happens During an EV Charger Installation

We confirm the charger and property details, assess the electrical supply and cable route, complete the agreed installation and explain the result.

  1. 01

    Confirm the Vehicle and Charger

    We discuss the vehicle, selected charger, parking position, property type and expected charging requirements.

  2. 02

    Assess the Electrical Installation

    We check the consumer unit, earthing, electrical demand, supply details and proposed cable route.

  3. 03

    Install the Agreed Charging Point

    The charger, circuit, protective devices, isolation and cable route are installed within the agreed scope.

  4. 04

    Test and Handover

    The installation is tested and we explain charger operation, isolation and any further electrical work identified.

Before the appointment

Provide Access to the Parking and Electrical Supply

Clear access to the parking space, charger location, consumer unit and proposed cable route helps avoid delays.

  • Keep the parking space and charger position clear
  • Have the charger model and vehicle details available
  • Provide access to the consumer unit, meter and supply equipment
  • Tell us about solar panels, batteries, heat pumps or other high-load equipment
Tell us about other significant electrical loads before the appointment. Air-conditioning equipment, heat pumps, solar generation or battery storage may affect the available capacity and load-management approach. The wider electrical installation may need separate assessment, while larger work can be coordinated through our electrical contractor service.
Not Included Unless Agreed
  • Groundworks, trenching or extensive building work
  • Decorating or making good beyond the agreed scope
  • Parking-bay permissions, leases or third-party charges
  • Electrical upgrades not included in the quotation
05 · Property types

EV Charger Installation for Different Properties

The installation approach depends on ownership, parking access, electrical capacity, charger location and the number of vehicles to be served.

Home

Houses and Flats

A home charging point planned around a private driveway or dedicated parking space and the household electrical supply.

Rent

Rental and Managed Properties

Landlord, freeholder or managing-agent permission may be needed before the charger and cable route are agreed.

Work

Workplaces and Commercial Sites

Single or multiple chargepoints can be assessed around staff, visitors, fleet use, parking layout and electrical demand.

Shared

Flats and Shared Parking

Shared supplies, allocated bays, communal routes and property permissions must be confirmed before installation.

Assessment Vehicle, charger, parking, route and electrical details are reviewed before the scope is agreed.
Access Access to parking, meter areas, consumer units and communal routes is considered when arranging the visit.
Handover Testing, charger operation and any further electrical recommendations are explained clearly.
If the electrical supply has a problem

We Assess the Problem Before Changing the Scope

If assessment or testing identifies supply limitations, wiring faults or unsuitable protection, we explain the issue before additional work is quoted.

View Fault Finding Service
06 · EV charger quotations

How EV Charger Installation Is Quoted

The quotation is based on the charger, electrical supply, parking position, cable route, protective equipment, access and any additional work included.

The property and charger details are confirmed first Send the postcode, vehicle and charger details, parking position, consumer unit information and any access restrictions.
Home EV Charger Installation
Quoted

For a charging point serving a private driveway or dedicated residential parking space.

The charger, cable length, route, consumer unit, supply capacity and protective arrangements affect the quote.
Assessment may be required
Workplace and Multiple Chargers
Quoted

For staff charging, fleet use, visitor parking or more than one charging point.

The number of chargers, load management, distribution equipment, cable routes and site access affect the quote.
Assessment may be required

The quotation may change if supply limitations, unsuitable protection, concealed route problems, additional distribution work or permissions outside the original scope are identified. Any change is discussed before additional work begins.

07 · Why planning matters

Why EV Charger Installation Needs Proper Planning

An EV charger is a long-duration electrical load. The charger, cable route, protective devices and available capacity must be assessed together before installation.

Do not continue using a charger that is damaged, overheating, sparking or repeatedly tripping. Isolate it only where this can be done safely and report the fault to an emergency electrician in London.

Electrical capacity The Available Supply Affects Charging Performance

The charger rating does not by itself determine the charging rate. Vehicle limits, property demand, supply capacity and network requirements can affect the final output.

Existing demand

Heating, cooking, air conditioning and other large loads contribute to the property’s total demand.

Load management

Dynamic load management may be considered where the charger must operate alongside other significant electrical loads.

Network connection

The DNO connection process may require notification or approval depending on the existing supply and proposed installation.

Protection and cable route The Circuit Must Be Suitable for Long Charging Periods

EV charging can continue for several hours. The circuit, connections, cable route, earthing and protective devices must suit the charger and installation conditions.

Dedicated circuit

The charger may require its own circuit and isolation arrangement within the agreed installation.

Protective devices

The protection selected depends on the charger, earthing arrangement and existing electrical installation.

Outdoor route

External cable routes and equipment positions must be planned around exposure, impact and practical access.

Vehicle and charger choice One Charging Setup Does Not Suit Every Vehicle or Property

Connector type, charger output, tethered or untethered design, smart functions and future vehicle plans can affect the most suitable installation.

Vehicle compatibility

The vehicle’s onboard charging limit and connector type affect how it uses the installed chargepoint.

Daily charging needs

Typical mileage, overnight parking time and tariff preferences can influence charger selection.

Future requirements

A planned charger position and cable route can account for a future vehicle or a later site expansion.

Permissions and records Property Rights and Installation Records Matter

Homeowners, tenants, landlords, freeholders and businesses may have different permissions and access arrangements. These should be resolved before installation.

Property permission

Tenants and leaseholders may need written permission for the charger, cable route and use of a parking bay.

DNO process

The installer must notify the network operator or apply through the relevant connection process.

Testing and handover

Installation test results and operating information support future maintenance and fault investigation.

Plan charging around the vehicle and property

Confirm the Charger, Parking and Electrical Details

Send the postcode, vehicle and charger details, parking photographs, consumer unit information and any property permissions already obtained.

Before you book

Details That Help Us Plan Your EV Charger Installation

A few details about the vehicle, charger, parking and electrical installation help us understand the likely scope.

Vehicle and Charger

Tell us the vehicle model, connector type and whether you have selected a tethered or untethered charger.

Parking and Cable Route

Send photographs of the parking position, proposed charger location and route back to the electrical supply.

Property and Electrical Supply

Include the property type, consumer unit photographs, meter position, known high-load equipment and any landlord or freeholder permission.

EV charger installation arranged by RCD Electrical in London
RCD Electrical EV charging guidance

EV Charger Installation Questions

Answers about charger choice, electrical capacity, parking, installation, DNO requirements, property permission and quotations.

The charger and electrical supply must be assessed together

Vehicle compatibility, parking, cable route, electrical demand, consumer unit condition and property permissions can affect the installation.

01What is included in an EV charger installation?

The agreed work may include assessment of the supply and parking position, a dedicated circuit where required, cable installation, protective devices, charger mounting, testing, commissioning and handover.

02How do you decide which EV charger is suitable?

The choice depends on the vehicle, connector type, parking arrangement, daily charging needs, electrical capacity, preferred smart features and whether a tethered or untethered unit is required.

03What charging speed can I have at home?

The charger rating does not guarantee the final charging rate. Vehicle limits, supply capacity, existing demand, cable route and network requirements must be assessed before the output is confirmed.

04Does an EV charger need a dedicated circuit?

A dedicated circuit and suitable isolation are commonly required. The final arrangement depends on the charger, consumer unit, earthing and existing electrical installation.

05Will my consumer unit need to be replaced?

Not in every property. The available ways, condition and protective arrangements are assessed first. Any required consumer unit work is explained and quoted separately.

06What is the difference between tethered and untethered chargers?

A tethered charger has a fixed charging cable. An untethered unit uses a separate removable cable. Vehicle compatibility, storage, appearance and everyday use can affect the choice.

07Can you install an EV charger at a rented or leasehold property?

Yes, subject to the parking arrangement, electrical supply and the required permission from the landlord, freeholder, managing agent or other property owner.

08Can EV chargers be installed for workplaces or fleets?

Yes. Workplace and fleet installations can include one or several chargepoints. Site demand, distribution equipment, parking layout, access and load management affect the design.

09Does the Distribution Network Operator need to be informed?

The installer must notify the Distribution Network Operator or apply through the relevant connection process. The route depends on the existing supply and proposed charger installation.

10Can an EV charger work with solar panels or battery storage?

Some charging systems can operate alongside solar generation or battery storage. Compatibility, controls and available capacity need to be assessed as part of the wider electrical setup.

11Do I need off-street parking for a home charger?

A standard home installation needs a safe, dedicated parking position and an agreed cable route. Charging across a public pavement should not be assumed and may require a separate local-authority arrangement.

12How long does EV charger installation take?

The time depends on the cable route, charger position, consumer unit, access, supply condition and any additional electrical work. The likely scope is confirmed after the property details are reviewed.

13What details should I provide before booking?

Provide the postcode, vehicle and charger details, photographs of the parking area and consumer unit, the meter position, proposed cable route, known high-load equipment and any property permissions.

14What should I do if my charger is damaged or repeatedly trips?

Stop using a charger that is damaged, overheating, sparking or repeatedly tripping. Isolate it only where this can be done safely and arrange fault assessment before using it again.

Arrange EV charger installation

Send the Vehicle and Property Details

Include the postcode, vehicle, charger, parking photographs, consumer unit details and any landlord or freeholder permission.

London coverage

EV Charger Installation Across London

We arrange home, rental-property and workplace EV charger installations across Central, West and North West London, including the areas listed below.

  • Fulham
  • Hammersmith
  • Chelsea
  • Kensington
  • Holland Park
  • Putney
  • Battersea
  • Westminster
  • Central London
  • West London
  • North West London
  • Blackfriars
  • Golders Green
  • Finchley
  • Hendon
  • Hampstead
  • West Hampstead

For a property outside these locations, send us the postcode and we will confirm availability.

Arrange EV charger installation in London

Book an EV Charger Installation Assessment

Book online, call us or send the property details through our contact page.